VERIFICATION OF AN INDUSTRIAL COMPUTER NETWORK OF HIGH RISK OPERATION PLANTS - A NPP APCS Example

Vitaly Promyslov, Stanislav Masolkin

2010

Abstract

A modern APCS (automated process control system) of large plants, involving nuclear power plants (NPP), is implemented as networked control system. In the paper, model based on the “network calculus” for an NPP APCS segment is presented. A method of calculation of time characteristics of the system under worst combination of input conditions is verified.

Download


Paper Citation


in Harvard Style

Promyslov V. and Masolkin S. (2010). VERIFICATION OF AN INDUSTRIAL COMPUTER NETWORK OF HIGH RISK OPERATION PLANTS - A NPP APCS Example . In Proceedings of the 7th International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO, ISBN 978-989-8425-00-3, pages 74-79. DOI: 10.5220/0002878900740079

in Bibtex Style

@conference{icinco10,
author={Vitaly Promyslov and Stanislav Masolkin},
title={VERIFICATION OF AN INDUSTRIAL COMPUTER NETWORK OF HIGH RISK OPERATION PLANTS - A NPP APCS Example},
booktitle={Proceedings of the 7th International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO,},
year={2010},
pages={74-79},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0002878900740079},
isbn={978-989-8425-00-3},
}


in EndNote Style

TY - CONF
JO - Proceedings of the 7th International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO,
TI - VERIFICATION OF AN INDUSTRIAL COMPUTER NETWORK OF HIGH RISK OPERATION PLANTS - A NPP APCS Example
SN - 978-989-8425-00-3
AU - Promyslov V.
AU - Masolkin S.
PY - 2010
SP - 74
EP - 79
DO - 10.5220/0002878900740079