TWO-SIDED ASSEMBLY LINE - Estimation of Final Results
Waldemar Grzechca
2008
Abstract
The paper considers simple assembly line balancing problem and two-sided assembly line structure. In the last four decades a large variety of heuristic and exact solutions procedures have been proposed to balance one-sided assembly line in the literature. Some heuristic were given to balance two-sided lines, too. Some measures of solution quality have appeared in line balancing literature: balance delay (BD), line efficiency (LE), line time (LT) and smoothness index (SI). These measures are very important for estimation the balance solution quality. Author of this paper modified and discussed the line time and smoothness for two-sided assembly line. Some problems, which appeared during evaluations, are mentioned.
DownloadPaper Citation
in Harvard Style
Grzechca W. (2008). TWO-SIDED ASSEMBLY LINE - Estimation of Final Results . In Proceedings of the Fifth International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO, ISBN 978-989-8111-30-2, pages 231-237. DOI: 10.5220/0001500102310237
in Bibtex Style
@conference{icinco08,
author={Waldemar Grzechca},
title={TWO-SIDED ASSEMBLY LINE - Estimation of Final Results},
booktitle={Proceedings of the Fifth International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO,},
year={2008},
pages={231-237},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0001500102310237},
isbn={978-989-8111-30-2},
}
in EndNote Style
TY - CONF
JO - Proceedings of the Fifth International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO,
TI - TWO-SIDED ASSEMBLY LINE - Estimation of Final Results
SN - 978-989-8111-30-2
AU - Grzechca W.
PY - 2008
SP - 231
EP - 237
DO - 10.5220/0001500102310237